BeMC Gears Up to Tackle Possible Heavy Rainfall and Cyclone ‘Akaban’ After Cyclone Arnab

BMC-PREP

Preparation meeting for the upcoming cyclone was held with Corporators and officials of various line departments. The preparedness measures, inter-departmental coordination and response arrangements were reviewed in detail.

24-Hour Control Room to Become Operational from November 18; 24 Temporary Shelters Identified for Evacuation of Vulnerable Residents

DIAL:- BeMC Control Room: 7608880480

Manoj Kanta Dash,Odishabarta

Brahmapur, November 17, 2026: In view of the possibility of heavy rainfall and the approaching Cyclone ‘Akabaan’, the Berhampur Municipal Corporation (BeMC) has initiated precautionary measures and stepped up its preparedness to tackle any potential emergency.

A high-level preparedness meeting was held at the BeMC office under the chairmanship of Commissioner A. Sasya Reddy. Deputy Mayor E. Vivek Reddy, corporators, the MLA’s representative, senior officials and engineers of the Corporation, along with officers from various departments, participated in the meeting and discussed detailed arrangements to deal with the possible impact of the weather system.

Mayor Sanghamitra Dalai joined the meeting through video conference and appealed to all concerned to work collectively and ensure an effective response to the impending disaster.

According to the Corporation, a 24-hour control room will become operational at the BeMC office from the morning of November 18 to monitor the situation and respond to public grievances and emergency requirements.

The Corporation has identified 24 temporary cyclone shelters. Employees will be deployed round the clock at these shelters to ensure their proper management. People living in vulnerable kutcha houses and low-lying areas will be evacuated and accommodated in the designated shelters, if required.

In coordination with the Drainage Department, the BeMC has decided to remove encroachments along the Bahana and Sapua drains on a war footing to facilitate the smooth discharge of rainwater and minimise the risk of urban flooding.

The meeting also reviewed the threat posed by vulnerable trees. It was decided that BeMC officials, Tata Power personnel and the Fire Services Department would jointly coordinate with skilled local workers to undertake advance pruning of dangerous tree branches to prevent possible accidents and power disruptions.

Although extensive drain-cleaning operations have already been undertaken in several waterlogging-prone areas, officials have been directed to continue the work with special attention to vulnerable locations.

Taking lessons from the heavy rainfall experienced during September and October, the Commissioner instructed officials to keep adequate manpower and machinery strategically positioned at critical locations to ensure a prompt response to any emergency.

The Commissioner also directed all employees to ensure that the special relief assistance programme announced by the Chief Minister for families affected by Cyclone Arnab continues without interruption.

Meanwhile, the BeMC has appealed to residents not to panic or believe rumours. People have been advised to report local problems and emergencies directly to the Corporation’s 24-hour control room.

BeMC Control Room: 7608880480       

The Corporation has urged citizens to remain alert, cooperate with the administration and follow official advisories to ensure public safety during the possible cyclone and heavy rainfall.